22.04.2016

Information about the Hermanowice point in the direction of Ukraine

Gas Transmission Operator GAZ-SYSTEM S.A. has been informed by its partner operator Ukrtransgaz about unplanned works in the transmission system on the Ukrainian side, starting from 16 May 2016, due to the necessity of repairing a ca. 8-km-long section of the Komarno-Drozdowicze pipeline. According to the Ukrainian Operator, the works will last 2 months and will result in suspending the possibility of transmitting gas through the Hermanowice point in the direction of Ukraine until they are completed.
In this context we would like to confirm that the Polish transmission system is prepared and fully operational to transport gas in the direction of Ukraine in this period. GAZ-SYSTEM S.A. will update the announcement every time it receives new information from the Ukrtransgaz operator.


Copyright © 2016 Gas Transmission Operator GAZ-SYSTEM S.A. All rights reserved.