News

The latest information about GAZ-SYSTEM.

 

Approval of the incremental capacity projects in accordance with Regulation (EU) 2017/459 (NC CAM)

05.05.2021

Gas Transmission Operator GAZ-SYSTEM S.A. informs that together  with the decisions of the President of the Energy Regulatory Office  issued on 29 April 2021, the administrative proceedings for the approval of three...

The Gas Inside Information Platform (GIIP) is now an official platform for publishing REMIT Inside Information

05.05.2021

28 April 2021 The Agency for the Cooperation of Energy Regulators (ACER) has confirmed that Gas Inside Information Platform (https://www.gasinsideinformationplatform.pl/) has successfully passed the second phase of assessment for...

Market consultation of the interconnection agreement between GAZ-SYSTEM S.A. and AB Amber Grid

27.04.2021

The Polish and Lithuanian transmission system operators – Operator Gazociągów Przesyłowych GAZ-SYSTEM S.A. and AB Amber Grid intend to conclude an interconnection agreement regarding the gas transmission through SANTAKA...

New Tariff for the transmission of high-methane natural gas of the Transit Gas Pipeline System EuRoPol GAZ s.a. for the year 2021.

27.04.2021

In connection with the Information of the President of the Energy Regulatory Office of 26 April 2021 (Biuletyn Branżowy- Paliwa gazowe Nr 28 (2429) 26 April 2021) please be informed that on 23 April 2021 the decision of the...

GAZ-SYSTEM developed the National Ten-Year Development Plan for the transmission system for the years 2022 - 2031

09.04.2021

On March 31 this year, GAZ-SYSTEM submitted to the President of the Energy Regulatory Office the draft National Ten-Year Development Plan (NTYDP) for the transmission system for the years 2022-2031. The market consultations...

Displaying results 31 to 35 out of 852< Previous456 78910Next >

Copyright © 2016 Gas Transmission Operator GAZ-SYSTEM S.A. All rights reserved.