Incremental procedure

INCREMENTAL PROCEDURE UNDER CAM NC

COMMISSION REGULATION (EU) 2017/459 (CAM NC) requires EU Transmission System Operators (TSOs) to undertake cooperation in processes to assess market demand for incremental capacity, and in technical analyses concerning incremental capacity projects for their respective interconnection points, at least in each odd-numbered year immediately after the start of the annual product auction.        

“Incremental capacity” that may result from an incremental procedure means:

  • increase of technical capacity at existing interconnection points;
  • creation of a new interconnection point or new interconnection points;
  • making physical reverse flows available on interconnections which were not previously offered.

Download:

Incremental capacity proces 2021-2023

Between 5 July and 30 August 2021, GAZ-SYSTEM conducted the third non-binding procedure to assess market demand for incremental capacity between the Polish and neighbouring transmission systems.

The conclusions from the incremental capacity process are presented in the following reports:

The next steps in the process of obtaining incremental capacity according to CAM NC will be published in this section.