Application forms

Below you can find the forms of applications for definition of the terms of connection and for provision of the transmission service in downloadable version.

APPLICATION FORMS FOR PROVISION OF THE TRANSMISSION SERVICE

We kindly inform, that since 1st June 2016 according to the arrangements in current version of the Transmission Network Code (v25) (TNC), the rules of application process for transmission contract, capacity allocation (PP) and transmission ability allocation (PZ) are changing. According to the arrangements in TNC the submission of above-mentioned applications and their analysis process shall take place by IES (Information Exchange System). For this purpose is necessary to submit an appropriate power of attorney, signed by the representative person in your organization, for the persons authorized to represent your organization in the above-mentioned procedures via the IES.

Download instructions (PDF) of electronicaly application for transmission contract and the PP, PZ and PP/PZ applications in Information Exchange System (IES)

Below you can find form of application for transmission capacity/ability allocation possible to import only in IES system due to electrionic application flow from 1st of June 2016.

Download form of the application for capacity allocation (PP)

Download form of application for transmission ability allocation (PZ)

Download form of application for transmission capacity/ability allocation (PP/PZ)

Download instructions for filling in the PP, PZ and PP/PZ applications (PDF)

Download the power of attorney to register in the IES (PDF)

Download the power of attorney to act in the IES within the scope of utilisation of services of GAZ-SYSTEM S.A. (PDF)

Applications valid till 31st of May 2016:

Download form of the application for provision of the transmission service (DOC) and (PDF)

Download the instruction for completing the application for provision of the transmission service (PDF)

Download form of the application for capacity allocation (PP)

Download form of application for transmission ability allocation (PZ)

Download form of application for capacity/ability allocation (PP/PZ)

Download instructions for filling in the PP, PZ and PP/PZ applications (PDF)

Download the declaration of surrender of allocated capacity (PDF)

 

APPLICATION FOR PROVISION OF THE TRANSMISSION SERVICE -TGPS

Download the application for transmission contract (DOC) and (PDF)

Download form of application for capacity/ability allocation (PP/PZ)

Download the power of attorney to register in the IES (PDF)

Download the power of attorney to act in the IES within the scope of utilisation of services of GAZ-SYSTEM S.A. (PDF)

 

APPLICATIONS FOR DEFINITION OF THE TERMS OF CONNECTION TO THE TRANSMISSION GRID

 Download the instruction for completing the application for definition of the terms of connection to the transmission grid (PDF)

Application for inquiry about the possibility of connection to the network managed by Gas Transmission Operator GAZ-SYSTEM S.A. (TSO)
(PDF or DOC)

Application for definition of the terms of connection to the transmission grid operated by GAZ–SYSTEM (TSO) for an entity of C Group engaged in gas transmission or distribution
(PDF or DOC)

Projection analysis for an entity engaged in gas distribution

Application for definition of the terms of connection to the transmission grid operated by GAZ–SYSTEM (TSO) for an entity of A Group, constituting a final consumer of natural gas
(PDF or DOC)

Application for definition of the terms of connection to the transmission grid operated by GAZ–SYSTEM (TSO) for an entity of C Group possesing a liquefied natural gas installations
(PDF or DOC)

Application for definition of the terms of connection to the transmission grid operated by GAZ–SYSTEM (TSO) for an entity of C Group engaged in gas storage
(PDF or DOC)

Application for definition of the terms of connection to the transmission grid operated by GAZ–SYSTEM (TSO) for an entity of C Group engaged in extraction activity from gas mines
(PDF or DOC)

Attachment – parameters and quality of gas offtaken in subsequent years of field operation (until depletion)
(PDF or DOC)

APPLICATIONS FOR DEFINITION OF THE TERMS OF CONNECTION TO TRANSIT GAS PIPELINE SYSTEM (TGPS)

Application for definition of the terms of connection to transit gas pipeline system (TGPS) owned by EuRoPol GAZ s.a. (DOC, PDF)


Newsletter
Copyright © 2016 Gas Transmission Operator GAZ-SYSTEM S.A. All rights reserved.