Rembelszczyzna - Mory Gas Pipeline

Description of the investment

Basic investment parameters:

  • high pressure gas pipeline
  • diameter: 700 mm
  • working pressure: 8.4 MPa
  • material: no current data available
  • length: ca. 30 km

Location
The investment will be located in the Mazowieckie Province, within legionowski, warszawski zachodni and warszawski counties, in the following communes: Nieporęt, Jabłonna, Warsaw, Łomianki, Stare Babice, Ożarów Mazowiecki.

Route of the gas pipeline

 Benefits from the investment

  • development of the Warsaw region, safe gas deliveries to the end users and connection new gas recipients to the transmission system, including other prospect power facilities, such as EC Siekierki Power Station,
  • reduction of workload related to existing gas pipelines supplying the Warsaw region, that may extend their maintenance and limit the number of failures in the system,
  • flexible operation of the transmission system in the events of discontinuity of gas deliveries or in the case of total lack of supplies from the eastern direction,
  • secure operation of the system for subsequent several dozen years (high urbanization of the region may prevent from further extension of the system and therefore new gas pipelines ought to hold relevant capacity to protect future needs).