TGPS Transmission Network Code

According to decision of the President of the Energy Regulatory Office designating the GAZ-SYSTEM S.A. as an independent system operator of the Polish section of the Jamal pipeline, the draft of the Transmission Network Code of Polish Section of the Jamal Pipeline (TNC TGPS) with standard transmission contracts and framework transmission contracts have been prepared.

After receiving comments and remarks from stakeholders, the Gas Transmission Operator GAZ-SYSTEM S.A. has submitted a draft of updated TNC TGPS for approval to the President of the Energy Regulatory Office.

New version of TNC TGPS (coming into force from 1st March 2016)

On 3rd February 2016 the President of the Energy Regulatory Office issued Decision DRR-4322-3(12)/2015/2016/AN by virtue of which he approved the Transmission Network Code of Polish Section of the Jamal Pipeline (TNC TGPS) and determined the date on which the TNC TGPS comes into force as of 1st March 2016 from 6:00.

Download:

  • TGPS TNC version 3 (in force from 1st March 2016):

President ERO decision nr DRR-4322-3(12)/2015/2016/AN

TGPS TNC (pdf) 

TGPS TNC (pdf)

 

Archival versions of TGPS TNC

 

NOTICE:

The English version of the Transmission Network Code (TNC TGPS) is available for information purposes only. In the event of any discrepancies arising between the  TNC in the Polish language and the TNC in the English language, the provisions of the Polish language version shall be legally binding.


Newsletter
Copyright © 2016 Gas Transmission Operator GAZ-SYSTEM S.A. All rights reserved.